Last weekend my hubby and i went out of town for the night and on Friday i knew that people would be at the house to work. i snapped this photo before we left, a last shot of the old tile. later that day we got a call from the project manager that said they found more subflooring that was rotted and they would have to come back on Monday to finish. the section is right there by the door frame to the right of my feet (top of the photo) like a 12x12 space.
When we came home late on Saturday night, there was a van in our driveway and two men in the house. We went in to talk to them and they said that they went ahead and got started. They had sheet rock lined up in the doorway to our bedroom and all the supplies all over the place.
This is the boxes of tile for the shower walls
here is the shower floor waterproofed
They were about to start water proofing the walls when they asked if we wanted to see the nook and the ledge above. "Of Course!" i was all the heart eyes right then and there. it was perfect.
There was a weird piece on the ceiling that they described as the same material as a dry erase board. We thought it was staying but they went ahead and sheet rocked it.
here you can see the space that was replaced on the subflooring.
These boxes is the shower flooring and the bathroom floor
all taped up and ready to go.
follow the brown paper road out the house and too the bathroom.
This was Monday. There was less supplies than Saturday which means progress.
I saw the box was opened and tiles removed so i thought that it was already on the wall.
NOPE!
Just stacked in the bathroom ready to go on the walls. Isn't it pretty though?
also the photo above is the water proofing on the walls.
This is where they stopped after the first day of tiling
This was after day 2 of tiling
that nook though. just love it
i spy shower floor tile
i may have squealed when i saw this
it is coming together so well. i am so impressed with the work. when i get home today i am so excited to see what will be done. seeing it all come together helps all the dust and cleaning that is going to have to be done.
TIME LINE:
We are hoping they are completed with all the tile by Friday.
After Memorial Day what will be left is...
new light fixture
baseboards
painting
reset toilet and pedestal sink
mirror