Thursday, July 26, 2018

Kitchen Update

the label 2016 flood will take you to all the posts from when we had the house flood an the kitchen remolded. 
there were two parts that we didn't get completed.
one of them was the back splash. it wasn't something that we had initially so we knew that any back splash would all be out of pocket and that it would be something that we could do later, when we wanted to.
the other thing was a decision about putting the Smokey Joe back in. 
 we  had multiple people tell us that we could not put the original one anywhere else in the house but exactly where it was before. sure we could have gotten a smaller pad for it but to relocate it was out of the question. we could relocate a newer model but not the original. after the project was completed and the Smokey Joe was removed we loved how open the space was. so for the last year and a half we have had this pipe hanging out of the ceiling. i hate that this is the only photo that we have of the pipe. it is much bigger that the picture looks.

we made the decision this summer to have someone come and remove the pipe and then we had someone else come and do that sheet rock work and then paint the area, as well as some sheet rock work in the living room.


we had the smoke stack and ring removed. 

the roof had to be repaired.

so there was a piece coming out of the roof (smoke stack)
there was a piece in the house (black ring)
and then when he removed the inside piece there was a piece between the two and it was nailed into the wood studs in the attic
it was nailed with 12 pretty long some rusty nails. it was a long and loud process for the guy who did it and i think he was surprised that he had to get it out but he did it.

we knew that they weren't going to be able to sheet rock it so he just put a piece of plywood over the hole. when i head a spray can i thought, "what is he spray painting?" i looked in and saw that he was spray painting the plywood white. i thought it was funny. it didn't really make it any less noticeable but sweet that he was considering that aesthetics.  

thankfully we didn't live another year and a half with the ceiling looking like that. it was about a week and we had another guy come out and patch and plaster one day. 

he sanded it the next day

and the last day he came back and primed and painted it

along with the kitchen we had some air vents in the living room that needed to be taken out (it was the last three from when the ac/heating unit was running through the attic)
we also had areas that we messed up patching ourselves and places where we covered a hole with white duck tape. 
YES! i know, crazy.

this was the patch work to fix the holes



we covered everything for sanding and painting day


here is is all painted. it looks fantastic. i am so glad that we had it done. we thought about putting 4 canned lights in here because that track lighting on the other side of the room is the only ceiling light. we do have a lamp too. we decided against it for now. we plan on replacing the track lighting because we just don't like it but we think the room gets plenty of light for the day time and usually we don't have the lights on in here at night and if we do the lamp is plenty.

No comments:

Post a Comment